Tipper360 Savings Calculator – How much are paper dockets costing you?
Live savings model — every number cited

How much is paper dockets costing your tipper fleet?

Adjust the sliders — see your annual waste from admin, disputes, lost time and reporting. Based on published construction benchmarks, not guesswork.

Your operation

Total loads across fleet (incl. subbies)
Owner-operators + employees you manage
Typical charge per delivery / waste movement
Queried quantity, location, classification
Looking for dockets, photos, signatures

📊 Your estimated annual saving

Live as you adjust — all figures include admin, disputes, search & reporting

Total estimated annual saving
£0
money you're currently losing to paper-based gaps
Admin time saved
0 hrs / yr
Disputed load cost eliminated
£0
Document search time saved
0 hrs / yr
Basis: HSE plant paperwork benchmark — 12 min to locate paper vs instant search
Client report time saved
0 hrs / yr
Basis: CIOB/Atkins — 45 min weekly report vs <2 min export
Talk through your numbers on WhatsApp

Estimates based on published industry benchmarks (CECA, CIOB, ERMCO, EA). Your actual savings may vary — adjust sliders to match your operation.

📚 Assumptions & sources — every number cited

Nothing invented. Where a range exists we use the mid-point. Challenge any figure — adjust sliders to reflect your real costs.

What we calculateValue usedWhy this numberSource
Admin time per paper docket10 minMid-point 8–12 min range for manual processingCECA/Atkins Reducing Construction Paperwork; HSE benchmarks
Admin time — C&D waste & planings+2 minEWC codes, Duty of Care fieldsEnvironment Agency Duty of Care; CIWM guidance
Admin time — ready-mix+3 minWater addition logs, idle time, pour certERMCO Ready Mixed Concrete Statistics
Dispute cost — C&D waste£270Mid of £200–£340; regulatory dimensionCIOB Procurement Efficiency; Atkins benchmarks
Dispute cost — aggregates£190Mid £140–£240; quantity/grade onlyCIOB; CECA claims data
Dispute cost — ready-mix£310Mid £240–£380; water compliance + timingERMCO; Concrete Society
Dispute cost — planings£250Mid £190–£310; Article 28 chain-of-custodyEnvironment Agency; CIWM
Ready-mix idle — % loads with chargeable wait15%Industry avg (congestion, delayed pour)ERMCO industry report
Ready-mix idle — % currently unrecovered60%Without timestamp proof, clients disputeERMCO waiting time recovery data
Document search time12 min/searchPaper/WhatsApp retrieval vs instant searchUK HSE Plant Paperwork benchmarks
Client report compilation45 min/reportManual collation vs <2 min digital exportCIOB/Atkins project admin research
Office staff hourly rate£35 / €41Construction admin role, inclusive of on-costsONS / Eurostat construction sector
📌 transparency promise Every figure above is drawn from public research. If you have better data for your fleet, adjust the sliders — the calculator is a conversation starter, not an invoice.