Hub360 Built Solely for Construction. Proof, Not Paperwork.

Hub360 vs Generic ePODs

Project-based call-offs · Chain of custody · Offline-first · 20+ years’ construction experience

If you’ve ever lost a day to chasing paper dockets or proving who moved what and where—you already know the problem. Many systems claim to “go digital.” Hub360 does something more useful: it captures proof as the work happens and turns it into a clean, shareable chain of custody your clients and authorities accept.

Built solely for construction. Our team brings 20+ years on real projects—QS, civils, demolition, utilities, highways, developers and LAs. That experience is wired into the defaults, not added later.

1) Project-first, not generic

Hub360 mirrors how projects actually run: call-off → load → tip, tied to work packages / tasks / zones. Each movement carries context—material, LoW/EWC (when waste), permits, receiving facility—and collects photos, GPS, timestamps and signatures by default.

Less adminCleaner valuationsFewer disputes

2) Instant chain of custody (proof, not PDFs)

Every movement assembles a verifiable audit pack: who/what/where/when, photo evidence, acceptance/rejection at the facility, and a tamper-evident history. Share via read-only portal or export CSV/PDF/API—no re-keying into ERP/CDE/finance.

3) Compliance-native by design

  • Waste: producer → carrier → receiver, LoW/EWC codes, acceptance/reject, retention.
  • UK: data model mapped for Digital Waste Tracking (DWT) as APIs go live.
  • Ireland/EU & Nordics: PEPPOL-ready e-invoicing and SIIRTO-style flows are built-in.

4) Works when sites are messy (offline-first)

Basements, quarries, night works—no problem. Capture with no signal, auto-sync later. Exception flows at weighbridge/tip create corrective notes without extra admin.

5) Made for project roles

  • QS & Commercial: evidence packs aligned to work packages; faster approvals.
  • Site Management: live view by zone, material, subcontractor.
  • HSE/ESG: auditable chain of custody for inspections and tenders.
  • Back Office: no re-keying—exports drop straight into ERP/CDE/finance.

Hub360 vs Generic ePODs

Need on real projectsGeneric ePODHub360
Project/call-off model tied to work packagesWorkarounds & custom formsNative
Per-movement photos + GPS + timestampsOptional add-onsDefault
Offline capture (poor/no signal)VariesYes (offline-first)
Waste compliance (LoW/EWC, acceptance/reject, retention)Basic templatesBuilt-in
Shareable chain of custody (beyond PDFs)PDF dumpsSearchable audit pack + portal
No re-keying to ERP/CDE/FinanceOften manualCSV/PDF/API ready
Time to value on live projectsLong setups2-week call-off pilot

What changes when you switch

  • Disputes drop: GPS + photos + timestamps end “who/where/when” arguments.
  • Approvals speed up: QS/client packs are ready—no binder hunts.
  • Month-end calms down: search by project → package → material → vehicle.
  • Tenders strengthen: demonstrable ESG/compliance capability.

© Hub360. Built solely for construction. Proof, not paperwork.

Previous
Previous

UK/EU Ready-Mix: Wetting Times, Site Water & Idle Time — Done Properly (with Digital Sign-off)

Next
Next

Digital Dockets: Why Tipper and Bulk Haulage Businesses Are Leaving Docket Books Behind